|
Cape Santiago
(BLT: 2001)
|
| Cape Santiago |  |
|
| Geared Cellular Containership |
| TEU: | 1121 |
| Deadweight: | GERMANISCHER LLOYD
+ 100 A 5 E CONTAINER SHIP SOLAS II-2, REG 54
+ MC E AUT
|
| Shipyard: | STOCZNIA GDANSKA S.A. |
| Class: | GERMANISCHER LLOYD |
| Main Details: |
| |
| LOA: | 158,75 M |
| LBP: | 145 M |
| B (MLD): | 24,00 M |
| BEAM MOULDED: | |
| Container Capacity: |
| CONTAINER INTAKE: | 20 | |
| On deck | 685 | 335 |
| In holds | 436 | 208 |
| | | |
| TOTAL | 1121 | 543 |
TONNAGE:
GROSS 14.079 TONS / NET 6.363 TONS (INTERNATIONAL) |
| Homogenous Load: | 820 TEU AT 14 MT EACH | |
| Stackweight: | DECK 70 T/STACK 20 FT | 90 T/STACK 40/45/49 FT |
| STACKWEIGHT IN HOLD: | 120 T/STACK 20 FT | 150 T/STACK 40 FT |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| Reefer capacity: | 179 REEFER CONTAINERS | |
| Holds / Hatches: | 4 HOLDS | 6 HATCHES |
| | IMO CLASSES 1.1 & 1.2 (HO#I-FWD) IMO CLASSES 2.1/2.2/2.3/3.1/3.2/4.1/4.2/5.1/6.1 and 8 (HO#I-AFT) |
| Hatchcovers: | PONTOON TYPE OPEN STEEL CONSTRUCTION
ALL HATCHES ARE COVERED WITH 2 PANELS EACH, DIVIDED LONGITUDINALLY IN CENTRELINE WEIGHT OF PANELS MAX 33 TONS INCLUDING LASHING EQUIPMENT |
| Machinery: |
| Main Engine: | CEGIELSKI MAN B&W / 7 S 50 MC DEVELOPING MCR 10.010 KW AT 127 RPM NOMINAL |
| DIESEL GENERATORS: | 3 x 6 CYL TYPE 6 L 20 MAKER WÄRTSILÄ FINNLAND OUTPUT 3 x 1020 KW AT 900 RPM / TOTAL 3636 KVA |
| |
|